Showing posts with label dave. Show all posts
Showing posts with label dave. Show all posts

Thursday, April 05, 2007

The Work Continues

The remodel of the basement continues to go well. They have broken through the concrete floor to install a pump for the bathroom. Some more of the framing was finished today and they created the master bedroom closet. Lot's of heavy hammering and digging went into breaking through the floor. The spaces around the windows were also cemented and insulated. Lot's of good work done today.
Participants
Dave P.
Daryl L.
Kyle B.
and Tom G.
Plumbing Work New Shower & Window Light
Master Bedroom Window Well
After the Day is Done
Daryl Tears Down the Old Closet in Order to Build the New One
Dave Applies the Sledgehammer
Kyle is on the Prowl
Dave Throws Lumber Through our Window





Monday, April 02, 2007

Remodel: Windows


Here are some pictures of the remodel in progress. Two egress windows were cut last week and new windows installed. Dave is outside right now putting the window wells in place. I was amazed at how much light flooded into the basement with those windows opened up. Wednesday they will start framing and hanging insulation. I am going to go and pick up a new toilet and pedestal sink for the new bathroom sometime this week. Jennifer doesn't have an Internet connection where she is at so you will be seeing this even before she does. I'll keep ya updated.

Master Bedroom Window
Guest Bedroom Window
Master Bedroom Exterior Window
Guest Bedroom Exterior Window