Here are some pictures of the remodel in progress. Two egress windows were cut last week and new windows installed. Dave is outside right now putting the window wells in place. I was amazed at how much light flooded into the basement with those windows opened up. Wednesday they will start framing and hanging insulation. I am going to go and pick up a new toilet and pedestal sink for the new bathroom sometime this week. Jennifer doesn't have an Internet connection where she is at so you will be seeing this even before she does. I'll keep ya updated.
Monday, April 02, 2007
Remodel: Windows
Master Bedroom Window
Posted by paddy1mac at 2:40 PM
Labels: dave, egress window, remodel
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment