Tuesday, April 10, 2007

Remodel: Master Bathroom

You can see our window down the bathroom hallway looking into our bedroom.
The open space to the left of the shower is the entrance from the bedroom into the bathroom.
The plumbing for the bathroom is in. You will see a black pipe in the walls and that is connecting to the sink which will be on the left. In front of the shower and a little right of the window will be the toilet.

The bathroom, master bedroom, guest bedroom and 3/4 of the office have been roughed in. The plan is to start running the wiring today, do some more framing and finish up some small plumbing things.

Many of you have been asking if we have heard anything else about the boys and the answer to that is no. News out of Ethiopia is pretty limited so we cling to any little bits that we receive. As far as we know all 3 are doing well. Josiah is still at the Infant Orphanage in Sodo and the brothers are still living with their Mom. Our Dossier (all of our paperwork) is getting ready to be sent to Ethiopia now.

0 comments: