Thursday, April 12, 2007

Remodel Update

Here are a couple of the can lights that are being installed downstairs. These two are in the guest bedroom and are similar to what will be throughout the downstairs..
Wiring has been run throughout the basement.
The floor has been poured and is now nice and level. You can see the pump center-left that was installed for the master bedroom bathroom.

0 comments: